Short answerMOQ stands for minimum order quantity: the smallest number of units a factory will produce in a single run. It is set by the cost of starting the line, not by the price of one unit. Materials bought in fixed rolls or reels, packaging print runs, a new mould, and the changeover time on an assembly line each impose a floor. Two factories quoting different minimums on the same product usually own different tooling, buy materials at different volumes, or are quoting different specifications.
| What sets the floor | Why it moves | What changes it |
|---|---|---|
| Moulds and tooling | A new mould is a fixed cost recovered over the first run | Ordering an existing model the factory already makes |
| Materials | Fabric, plastic and cells are bought by the roll, reel or tonne | Accepting a standard colour or material already in stock |
| Packaging | Printed boxes have their own minimum, often below the product MOQ | Using plain packaging for a first order |
| Line changeover | Setting up an assembly line costs hours regardless of quantity | Combining models or booking a shared production slot |
| Certification and testing | A new radio or battery configuration needs its own test file | Staying on a tested configuration |
A factory that says 500 units is not refusing to make 200. It is saying that the setup, materials and packaging for 200 cost the same as for 500, so the unit price for 200 would be higher than the buyer expects and the difference has to land somewhere.
This is why the same product can carry 100, 500 or 3,000 as a minimum at three suppliers. The one quoting 100 is usually selling a model it already produces and stocks, or it is a trader combining your order with someone else's.
Four levers move it: an existing model rather than a new design, a standard colour rather than a custom one, plain packaging rather than printed, and a tested configuration rather than a new radio or battery build.
Each lever trades differentiation for volume flexibility. A buyer planning a first market test normally takes all four; a buyer with a confirmed channel takes none and pays for the tooling once.
Ask what the minimum covers: per model, per colour, per carton or per shipment. A 500-unit minimum that applies per colour across four colours is a 2,000-unit order.
Ask whether the minimum is a production minimum or a price break. Some suppliers will produce less at a higher unit cost, and that is a different offer from a hard floor. Both are legitimate; confusing them leads to a purchase order that cannot be fulfilled.
Every model on this site is listed with its MOQ and its customisation options, because the two are linked: a model offered with a custom logo and colour usually carries a higher minimum than the same model sold as-is.